| Stage1.
The project is stripped down to it's component parts. The serviceable
parts are retained and the frame, forks, body panel, wheels, hubs
etc are blasted. The panel & frame work are repaired or welded
where necessary and primed ready for paint. All parts are finished
in two pack paint with the colour of your choice.
The
crank case is stripped bare, usually the case is then cleaned,
rough surfaces removed and is either blasted, powder coated or
painted to your preference.
Stage2.
The engine is then fully rebuilt using new quality parts including
crankshaft, bearings, seals, clutch chain guides. We fit electronic
ignition as an option but are happy to return the machine with
standard original electrical equipment. All engines are rebuilt
to include your personal requirements with any performance enhancements
added.
|
|